AI Wire — The Real Estate Edition

Executive Briefs & Feasibility Models

Companion investment committee memos, technical audits, and applied AI resources published by Dushyant Ahuja.

Published Brief · 4 November 2026 · 4-Page PDF

AI MPC + Hydraulic Optimisation Layer: Investment Committee Feasibility Analysis

Full underwriting model for a 6,600 TR central chilled water plant — covering thermodynamic power breakdown, cubic affinity pumping savings, all-in capex and seasonal payback, trapped hydraulic capacity deferral, and GAV valuation uplift.

4.13 GWh
Annual energy saved (15.6%)
₹5.17 cr
Gross saving / yr (≈ $587k)
3.6 months
All-in payback (average)
₹39.7 cr
GAV uplift @ 12.5% cap
2,200 TR
Trapped capacity unlocked